Appendix B of NEN-EN 1990:2002 sets requirements for the supervision level of design and calculations and the inspection level during execution, related to the reliability class the structure must meet. For the higher supervision and inspection levels, a check and inspection by a third party is required (a party independent of the designing and executing parties).
Due to demonstrated expertise and independence, Seconed, as an accredited TIS agency, can adequately fulfill this role for you.
A Third Party Check CC3 Eurocode is an independent review of the design and execution of a construction project. The review is carried out by an accredited TIS agency, such as Seconed. The Third Party Check CC3 Eurocode is mandatory for all construction projects that fall into the highest reliability classes (CC3) according to NEN-EN 1990:2002.
A Third Party Check CC3 Eurocode is important to ensure the safety of structures. By having an independent party check the design and execution, the risk of errors and defects is reduced. This can lead to shorter construction times, lower construction costs, and higher client satisfaction.
A Third Party Check CC3 Eurocode is mandatory for all construction projects falling under the highest reliability classes (CC3) according to NEN-EN 1990:2002. These include:
A Third Party Check CC3 Eurocode is typically carried out as follows:
The report contains a description of the findings from the Third Party Check CC3 Eurocode. It also includes an assessment of the design and execution of the work, along with recommendations for improvement.